CompletedD6
6th Street · Market–Howard
6th Street Pedestrian Safety Project
The long-term streetscape is delivered: wider sidewalks, new alley signals, bulb-outs, crossings, lighting, and public-realm upgrades.
Latest official readSFMTA says construction finished in August 2025 and celebrated completion in September; its October update says monitoring will continue.
- Next milestone
- No new dated milestone published; post-completion safety and traffic monitoring continues.
- Action to take now
- Report maintenance or safety regressions on the completed corridor.
Planning / preliminary engineeringD10
Cesar Chavez Street · Kansas–Illinois
Cesar Chavez Bikeway Improvements
The expanded project would consolidate buffered lanes into a protected two-way bikeway and improve crossings.
Latest official readSFMTA’s spring 2026 update expands the project five blocks east to Illinois Street and says construction will be phased around paving and utility work.
- Next milestone
- Complete approvals and start phased construction in 2026, beginning between Indiana and Illinois.
- Action to take now
- Ask the team for the approval and phase-one construction schedule.
Final design / permittingD3 · D6
The Embarcadero · Broadway–Brannan
Central Embarcadero Safety Project
The City is turning the earlier quick-build into durable waterfront bikeway, crossing, promenade, and transit-access upgrades.
Latest official readSFMTA’s fall 2025 update says the project reached 65% design and is advancing detailed engineering, federal review, and permitting.
- Next milestone
- Complete engineering, environmental review, permitting, and phasing before expected early-2027 construction.
- Action to take now
- Sign up for updates and weigh in on phasing and tree-removal notices before work begins.
Completed / evaluation pendingD4 · D7
Sloat Boulevard · Great Highway–Skyline
Sloat Boulevard Quick-Build
A protected two-way bikeway, crossing upgrades, and bus islands now connect Sunset Dunes, the Zoo, and Lake Merced.
Latest official readSFMTA says installation finished in mid-December 2025; the official timeline keeps a spring 2026 evaluation marked pending.
- Next milestone
- Publish the pending spring 2026 evaluation and use it to refine the interim connections.
- Action to take now
- Ask for the evaluation results and report issues at the new connections.
Completed / maintainedD10
17th / Vermont under US-101
Potrero Gateway Project
The underpass now has wider sidewalks, protected bike lanes, bulb-outs, planting, lighting, and public art.
Latest official readPublic Works says the project was completed in early 2025 and notes an ongoing maintenance partnership with the local Green Benefit District.
- Next milestone
- No construction milestone remains; continued maintenance is the live follow-through.
- Action to take now
- Report upkeep or access issues to Public Works and support continued maintenance.
Open / next-phase planningD4
Upper Great Highway
Sunset Dunes
The city’s new oceanfront park is open while Rec & Park plans the next layer of access, habitat, and community-requested amenities.
Latest official readOpen since April 2025; Rec & Park reports more than 1.7 million first-year visits and says 2025 feedback will shape improvements shared in 2026.
- Next milestone
- Rec & Park shares engagement results and advances community-requested improvements in 2026.
- Action to take now
- Follow the 2026 planning updates and join the next official engagement window.
CompletedD9
Valencia Street · 15th–23rd
Valencia Bikeway Improvements
Side-running protected bike lanes replaced the center-running pilot and restored selected left turns.
Latest official readSFMTA marks the project complete; its latest listed updates show the new lanes operating and left turns restored at three intersections in June 2025.
- Next milestone
- No future milestone published; operations and feedback continue after completion.
- Action to take now
- Report safety, loading, or maintenance issues on the finished corridor.
Finishing constructionD7
Frida Kahlo Way
Frida Kahlo Way Quick-Build
Most safety work is in place; a delayed boarding island and northbound bikeway connection remain.
Latest official readSFMTA says the project was substantially complete in fall 2024 and evaluated in spring 2026; final elements are expected in summer 2026.
- Next milestone
- Build the final boarding island and northbound connection in summer 2026, then evaluate in fall 2026.
- Action to take now
- Watch for the delayed elements to finish and send corridor feedback.
CompletedD7
Lake Merced Boulevard
Lake Merced Quick-Build
Traffic calming, crossing upgrades, protected bikeways, neighborways, and transit islands are delivered.
Latest official readSFMTA marks construction complete and shows the Fall 2023–Spring 2026 construction phase as completed.
- Next milestone
- No future milestone published after construction completion.
- Action to take now
- Review the corridor and report maintenance or operational issues.
Pre-construction / contractor selectionD6
Howard Street
Howard Streetscape Project
Howard’s design is complete and the project is moving through contractor selection before construction.
Latest official readSFMTA’s May 2026 Folsom-Howard update says Howard design is complete; the implementation page expects construction to start in late 2026.
- Next milestone
- Select the contractor and begin construction in late 2026.
- Action to take now
- Track contractor selection and sign up for updates before work starts.
Implementation / constructionD6
Folsom Street
Folsom Streetscape Project
The corridor is nearing the end of a major construction phase, with paving and finish work still active.
Latest official readPublic Works’ June 26 update says paving is substantially complete; SFMTA’s May update put the full corridor about 75% complete.
- Next milestone
- Finish 3rd Street-area paving in July and reach substantial corridor completion by October 2026.
- Action to take now
- Subscribe to updates and flag access or delivery impacts during the final work.
Detailed design / utility coordinationD1
Geary Boulevard · 34th–Stanyan
Geary Boulevard Improvement Project
The earlier quick-build is complete; the full surface project follows underground utility coordination.
Latest official readSFMTA lists planning and detailed design; its official update says full-scale construction starts in 2026 and finishing work runs through late 2027.
- Next milestone
- Confirm and start the SFMTA surface-construction phase in 2026.
- Action to take now
- Subscribe for the schedule and track promised crossings, refuges, and signals.
Completed / evaluatedD5
Hyde Street · Geary–McAllister
Hyde Street Quick-Build
The quick-build is complete and evaluated, with transit gains alongside a remaining double-parking problem.
Latest official readSFMTA marks the project complete and on schedule; its evaluation found faster 19-Polk trips but continuing transit-lane obstruction.
- Next milestone
- No dated milestone published; monitoring and adjustments remain the path.
- Action to take now
- Ask SFMTA to address double parking and report new corridor issues.
Implementation / constructionD4 · D7
Winston Drive
Winston Drive Quick-Build
Paving and crossing work are in; boarding islands, bikeway posts, and signal work are next.
Latest official readSFMTA’s May 2026 update says paving and crossing-shortening are complete, with paint substantially complete.
- Next milestone
- Complete bikeway and boarding islands by mid-August 2026; begin signal work in summer.
- Action to take now
- Track the mid-August promise and report access issues while work lands.
Completed / evaluatedD10
17th Street · Potrero–Pennsylvania
17th Street Quick-Build
The separated bikeway is complete and the official evaluation shows more walking and biking with fewer close calls.
Latest official readSFMTA says construction is complete; its May 2025 evaluation found daily bike volumes up 53% and pedestrian volumes up 20%.
- Next milestone
- No further dated milestone published after evaluation.
- Action to take now
- Report maintenance or safety regressions along the separated bikeway.